|
|
| MOQ: | 1 tas |
| harga: | Dapat dinegosiasikan |
| kemasan standar: | 25 kg per kantong, 60 kantong per palet / bungkus besar |
| Periode pengiriman: | 2-5 hari kerja |
| metode pembayaran: | L/C,T/T |
| Kapasitas pasokan: | 50ton per hari |
| Item | Thermoplastic Road Marking Paint |
|---|---|
| Appearance | Powder |
| Color | White, Yellow, and others |
| Main Material | C5 Petroleum Resin |
| Construction Temperature | 180-220℃ |
| Dry Speed | Within 3 minutes |
| Coverage Rate | 1 ton covers over 200㎡ |
| Package | 25kg per bag |
|
|
| MOQ: | 1 tas |
| harga: | Dapat dinegosiasikan |
| kemasan standar: | 25 kg per kantong, 60 kantong per palet / bungkus besar |
| Periode pengiriman: | 2-5 hari kerja |
| metode pembayaran: | L/C,T/T |
| Kapasitas pasokan: | 50ton per hari |
| Item | Thermoplastic Road Marking Paint |
|---|---|
| Appearance | Powder |
| Color | White, Yellow, and others |
| Main Material | C5 Petroleum Resin |
| Construction Temperature | 180-220℃ |
| Dry Speed | Within 3 minutes |
| Coverage Rate | 1 ton covers over 200㎡ |
| Package | 25kg per bag |